South Wales Steel Buildings

Groundworks calculator for a steel building in South Wales

The frame gets a price. The ground under it usually does not, and on a valley-side field it can come to as much again. Give this the size of the building, the fall across it and what you expect to dig through, and it lists what has to be ordered and what has to be carted away.

Planning the whole building rather than the floor? The 3D steel building designer runs this same take-off alongside the frame, cladding and doors.

Before you dig
100 m²
Build that much or more and the drainage needs SAB approval first, planning or not.
Sub-base
150 mm
Finished depth of Type 1. It goes down around 188 mm loose and is rolled to that.
One tipper
12 m³
Measured loose. Spoil swells once it is dug, so count loads from the loose figure.
Left out
Pads
Sized by an engineer from your site. A tool that gives you one has made it up.

Building

Tractors and trailers on and off it daily.

m
m

Slab

Set by the building type above. Change it if you know different.

mm

Each side. Leave at 0 if it finishes flush.

mm

Site

mm

High corner to low corner.

Balanced keeps the dug material on the plot and moves the least.

mm

Dig a trial hole and measure it. This shifts more muck than the slope does.

Concrete to order for the slab
52.0m³waste allowed, rounded to the half metre
Machinery store · slab 246.4 m² at 200 mm · working platform 352.6 m²
Ready-mix plant
Slab concrete
Net 49.3 m³ before waste
52.0m³
Quarry
Type 1 sub-base
Spread 188 mm loose to finish at 150 mm compacted
77.6t
Builders merchant
Mesh sheets
2.4 × 4.8 m sheets, 300 mm laps allowed
28sheets
Damp proof membrane
Laps and upstand included
276m²
Edge detail
Perimeter, for edge insulation or expansion joint
64.8m
Earthworks
Topsoil to strip
110.2 m³ once dug and loose
88.2m³
Cut
17.6m³
Fill
17.6m³

What this does not work out: the pad foundations

The concrete pads the stanchions sit on are sized by a structural engineer, not by a formula. They change with the span, the eaves height, the wind loading on your particular site and what the ground will bear. Anyone quoting you a pad size without a design has guessed it.

Want this priced properly?

Send us the job and we'll get you engineered drawings and a quote for the frame — with the pad sizes this tool can't work out. The figures above go with your enquiry, so you don't have to type them again.

Every enquiry gets a reply the same day, and your figures go with it. The building itself is designed and priced by South West Steel Buildings, our building partner, so your details go to them too, and they will be in touch. How we handle your details.

Two bills, not one

People comparing steel building prices are almost always comparing frames. That is fair as far as it goes: a frame quote covers the steel, the sheets, the fixings and, most of the time, the people who put it up. What it does not cover is the ground, and a frame standing in a field is not a building anyone can use.

The second bill is for everything between the grass and the steel. Taking the topsoil off. Cutting into the slope and filling the low side until there is a flat platform. Getting rid of what comes out. Digging and pouring the pads. Then the stone, the membrane, the concrete, the drains and a hard apron where the doors open. In South Wales, add the paperwork that has to be in place before any of it starts, which is the next section.

The frame and the ground meet at the pads. The frame designer's drawing fixes their size and where each set of holding-down bolts goes, and the groundworker builds to that drawing. Put the two in touch with each other early: a bolt group a few centimetres out is found on the morning the steel arrives, with a crane on the clock.

Three checks before the first bucket goes in

These are the parts of a Welsh groundworks job that no calculator can do for you, and each of them can stop a job that has already been booked.

Drainage approval from the SAB

In Wales, building work covering 100 square metres or more needs its surface water drainage approved by the SuDS Approval Body, run by your county council, before work begins. A farm building that is permitted development and needs no planning application is still caught. The SAB has 7 weeks from a valid application, and if it has not decided by then the answer is no, not yes. Where the roof water goes is the heart of it, so the drainage has to be designed with the base, not left for the groundworker to improvise. The Welsh Government's SuDS guidance sets out what the SAB wants to see, and our planning guide for farm buildings in Wales covers the fee and how it sits alongside prior notification.

The coal underneath

A large part of South Wales sits on the coalfield. The Mining Remediation Authority, which was the Coal Authority until it was renamed, maps it into a Development High Risk Area and a Development Low Risk Area. For groundworks the point is simpler than the planning rules: if excavation of building foundations, service trenches, development platforms or earthworks may cut into a coal seam, you need an incidental coal agreement from the Authority before the digger starts, and work that goes into old workings or mine entries needs its permit. Look the site up on the Authority's guidance and map before the pads are designed, because a recorded shaft can move the building. If the machine opens a void nobody knew about, stop, keep everyone back and ring 0800 288 4242, which is answered day and night.

Stock, slurry and dirty water

A livestock building brings its own groundworks. Yard water that has run through muck is not clean rain and cannot go down the same drain, and a new slurry store, or one being substantially rebuilt, needs written notice to Natural Resources Wales at least 14 days before building starts. Both change where the falls go and what gets dug, so settle them before the slab is set out. The livestock buildings page goes into the storage rules.

The floor slab

Two buildings of the same size can want very different floors. A long hay barn with a telehandler at the doorway once a week is a light-duty floor. A short workshop where the tractor sits on stands every winter is not, whatever its size.

What breaks floors is concentration. A loaded trailer spreads its weight through its tyres over a fair patch of concrete. Take the wheels off and put the axle on stands and the same weight goes through two small feet. A bench drill bolted down, a vice that lives in one corner and a jack that is always used in the same bay do the same, and they are why a floor that looked thick enough on paper cracks in its second year.

The calculator picks a starting thickness from the kind of building and lets you change it. Treat the preset as a sensible opening figure and your groundworker's knowledge of your ground as the deciding one.

How much concrete to order

Length times width times depth gives the concrete in a perfect slab, and there are none. The tool adds 5% for what spills, what fills the low spots in the formation and the slab that comes out a little deeper than drawn, and then rounds up to the 0.5 m³ steps the plant sells in.

Running short halfway through a pour leaves a joint where the fresh concrete met the set concrete, right across the floor. You can put most mistakes on this page right later. That one stays.

Reinforcement and the membrane

Mesh sheets are 2.4 by 4.8 metres and every edge has to overlap the next, so the floor always takes more sheets than its area suggests. The tool allows 300 mm of lap and some for cutting, which is why its count is higher than the sum in your head.

Fibre is the alternative: around 30 kg of steel fibre per cubic metre, or about 5 kg of macro polypropylene, mixed in at the batching plant. It saves fixing on site and reinforces the full depth, but it is written into the floor design by whoever designs it rather than chosen on the day.

The damp proof membrane is worked out as the slab area plus 12% for overlaps and turning up at the edges. It is one of the cheapest things on the list and one of the worst to add later.

The stone under the slab, and a dig wider than the building

Type 1 is laid loose and rolled down, so what goes in is always deeper than what is left. With the compaction this tool assumes, around 188 mm spread loose ends up at 150 mm rolled. Order for the finished depth and the last lorry will be missing.

Quarries sell it by the tonne and you lay it by the cubic metre. Rolled, it weighs about 2.1 tonnes a cubic metre, and that conversion is what turns a depth on a drawing into a number on a delivery ticket.

The platform has to be wider than the floor. The tool adds 1.5 m past the slab edge all the way round, for the shuttering and for the machines to stand on. Leave it out and the dig comes up short at the last corner.

Muck-away in Wales: volume, weight and tax

Ground packed tight for thousands of years breaks up when it is dug and does not pack back down in a lorry. Topsoil comes out around a quarter bigger. Clay swells more. Rock broken out with a breaker can fill half as much space again as the hole it left.

×1.5

Rock broken out of a dig takes up around 1.5 times the room it did in the ground; clay about 1.3 times, topsoil about 1.25. Lorries are loaded by volume, so the loose figure is the one you pay for.

An eight-wheel tipper takes about 12 cubic metres of that loose spoil, so on a sloping field the number of loads climbs fast. It is regularly the biggest line in the groundworks and rarely the first one anyone asks about.

The Welsh landfill tax

Spoil that ends up in a landfill in Wales pays Landfill Disposals Tax, which replaced the UK Landfill Tax here on 1 April 2018 and is collected by the Welsh Revenue Authority. It is charged by the tonne, and the landfill passes it on in its gate fee, so it arrives in the haulier's price rather than on a bill of its own.

For 2026–27, from 1 April, the lower rate is £8.65 a tonne. That is the rate for material such as clean soil and stone that qualifies under the Landfill Disposals Tax (Wales) Act 2017. Anything that does not qualify pays the standard rate of £130.75 a tonne. The lower rate was £3.30 in 2024–25, so it has gone up about 2.6 times in two years, as the Welsh Government uses it to push reusable spoil away from landfill. Two habits keep this part of the bill down: keep the spoil clean, with no rubble, timber or plastic mixed through it, and send away as little of it as possible.

Where you set the floor level

This is why the finished level matters so much. Setting the platform low cuts into the bank and leaves a heap of spoil to haul. Setting it high means buying fill. Setting it where the cut and the fill roughly balance moves the least earth and keeps most of it on the farm. If spoil is going anywhere other than the spot it was dug from, ask Natural Resources Wales whether it needs a waste exemption before it is spread, not after. In the calculator, switch the spoil-off-site option on and off and compare the loads.

What you are likely to dig into in South Wales

A generic calculator assumes a flat field with a known amount of soil on it. Very few South Wales holdings offer either, and the gap between the assumption and your field is where the budget goes.

Start with the slope. A field that looks level from the gate on a valley side can carry a noticeable fall across the length of a building, and fall decides how much is cut, how much is carted and whether the high side needs a retaining wall. Walk it with a laser level, corner to corner, before you ask anyone for a price. It takes minutes and it is the single most useful figure you can bring to a groundworker.

Then what is under the grass. Much of the region has glacial clay near the surface: it holds water, shrinks and swells with the seasons and bulks badly in a lorry. The rock below varies from place to place, with the sandstones and mudstones of the coalfield across the valleys, limestone on Gower and in the Vale of Glamorgan, and older sandstones, mudstones and shales in the west and up into the hills. Any of them broken out comes out bulky.

And the rain. The west and the uplands of Wales are among the wettest parts of Britain, so a base built here has to deal with a lot of water: where the roof sheds it, which way the yard falls, and what the threshold looks like on a wet night in the middle of winter. That is also why the SAB approval above is more than a form.

The only reliable way to find out is a trial hole with a tape measure in it, and the fall measured on the ground. Put both into the calculator once you have them.

How a groundworks job runs, start to finish

  1. Approvals and checks

    SAB drainage approval if the work is 100 m² or more, the coal check, any incidental coal agreement, and notice to Natural Resources Wales for a slurry store. All of it before a machine arrives.

  2. Topsoil off

    From the full working area, which is bigger than the building. Left under a slab it keeps settling for years. Dig a trial hole first to see how deep it goes.

  3. Cut, fill and level

    To the floor level you chose, not the one the slope pushes you towards. The number of loads leaving the site is fixed at this stage.

  4. Pads to the engineer's drawing

    Dug and poured with the holding-down bolts set to the erector's setting-out. Only once the design exists, never from a size somebody suggested on the phone.

  5. The frame goes up

    On the pads, before there is a floor. Cranes and access platforms tracking across a new slab mark it and crack it before it has seen a day's use.

  6. Stone, rolled in layers

    In several lifts, rolled each time. One thick layer never compacts at the bottom, however hard the roller works the top.

  7. Membrane, edges, pour

    The slab goes in last, under a roof and out of the rain. Drains and the apron are built to the approved drainage design at the same time, not patched in after the first wet season.

What the calculator leaves out, and why

Pad sizes. They need the span, the eaves height, the wind on your site and the strength of your ground. The tool knows none of those, so it does not pretend to.

Market prices. Concrete, stone and haulage are all priced by the mile from the plant or the quarry, and they move. Take the quantities to a local supplier and groundworker and the price you get back will be real.

Drainage, services and outside works. They cost real money, and in Wales the drainage has to be approved before it is built, but they depend too much on the site for any formula to be trusted.

Whether the ground will carry it. A trial hole and someone who knows what they are looking at will tell you. A calculator cannot.

Every assumption behind the numbers, from the waste allowances and bulking factors to the compaction, the lorry size and the cut-and-fill maths, is published with the range it comes from.

How the calculator works

Questions people ask

Does a steel building quote include the concrete base?
Nearly never. The frame supplier prices steel: the columns, rafters, purlins, bracing, cladding and fixings, and usually the crew and plant to put them up. The base is another trade on another contract. Stripping topsoil, levelling, carting spoil, the sub-base, the slab, the drainage and the apron in front of the doors are all yours to arrange. The two jobs overlap in one place only: the frame designer tells you how big the pad foundations are and where the holding-down bolts sit, and your groundworker digs and pours them to that drawing.
Do I need SAB approval for a concrete base in Wales?
If the building and the hard standing that goes with it cover 100 square metres or more, the surface water drainage has to be approved by the SuDS Approval Body at your council before work starts. That applies to farm buildings put up under permitted development as well as to ones with planning permission. The SAB has 7 weeks to decide a valid application, and one it has not decided in that time counts as refused, so the drainage design has to be done before the groundworker is booked, not after.
What if we hit coal while digging the foundations?
On the South Wales coalfield it can happen, and it is planned for rather than dealt with on the day. If excavation of building foundations, service trenches, development platforms or earthworks may cut into a coal seam, you need an incidental coal agreement from the Mining Remediation Authority before the work starts. If you find an old shaft, an adit or a void you did not know about, stop, keep people away from it and ring the Authority's 24-hour line on 0800 288 4242.
How much tax is there on muck-away in Wales?
Spoil that goes to landfill in Wales carries Landfill Disposals Tax, not the UK Landfill Tax, and has done since 1 April 2018. It is charged per tonne and the landfill passes it on in the gate fee. From 1 April 2026 the lower rate, for material such as clean soil and stone that qualifies under the Landfill Disposals Tax (Wales) Act 2017, is £8.65 a tonne, and the standard rate for everything else is £130.75. Keeping spoil clean, and keeping as much of it on the holding as you can, are the two things that control that part of the bill.
How thick does the slab under a farm building need to be?
That depends on what drives on it and how the weight arrives, not on the size of the building. A store that only ever sees a telehandler at the doorway can be at the lighter end. A floor that takes loaded trailers and turning tractors every day wants to be nearer 200mm with mesh in it. A workshop is the awkward one, because a tractor on axle stands or a press bolted to the floor puts its whole weight through a few square centimetres. Settle it against the heaviest thing that will stand on the floor, then have the groundworker check it against what the ground will carry.
Why will the calculator not size the pad foundations?
Because a pad is not a function of floor area. The engineer sizes each one from the span, the eaves height, the wind the building will take on its exact site and the bearing capacity of the ground beneath it. On a Welsh hillside the wind load alone can change the answer from one field to the next, and so can a change from rock to soft ground. Anyone offering a pad size without a design has invented it.
Why does more spoil come out than the size of the hole?
Dug ground loosens. Soil, clay and rock that were packed tight take up more room in a lorry than they did in the field: roughly a quarter more for topsoil, more for clay, and around half as much again for broken rock. Hauliers load by volume, so the loose figure is what decides how many loads you pay for, and on a sloping site it is easily the largest single item in the groundworks.
Mesh or fibre in a steel building floor?
Mesh is steel fabric in sheets, lapped and held at a set height in the slab so it takes tension where the design needs it. Fibre is mixed into the concrete at the plant and works throughout the depth of the pour. Mesh is still what most agricultural and industrial floor specifications call for. Fibre saves fixing time on site and suits some floors, but it is a design choice for whoever specifies the slab, not something to swap in on the day because the mesh is late.

Other buildings we cover

Same approach on each: what the building is, how it gets sized, where you stand on planning, and what the base underneath it comes to.

Price the frame and get the pad sizes

A rough span and length is enough to begin. You get engineered drawings and a price for the frame, pad sizes included, which is the one figure this calculator will not guess. If you have used the calculator, its figures travel with your enquiry.