General purpose farm buildings in South Wales
The shed that holds bales this year and ewes the next, designed and erected by South West Steel Buildings. The frame is easy to get right. The two things you cannot change later are the floor and the rules that follow the use, and this page is mostly about those.
- Usual span
- 12–20 m
- Pick it for the hardest job the shed may ever do, not the first.
- Slab
- 175 mm
- A middle spec with mesh. 200 mm if trailers will turn inside.
- If stock go in
- 400 m
- Housing livestock near a neighbour’s dwelling loses permitted development.
- Prior notice
- £223
- On 5 ha or more, up to 465 m². 28 days for the council.

What you are actually buying
A shed put up for one job that goes on to do several. Because the use keeps moving, the frame should be ready for the hardest of them: a little extra height, doors where a machine can go straight through, and a floor poured for the heaviest load it may ever carry.
Choose the span once
Widening means taking a side off. Pick the width for the most demanding job you can foresee, not for the bales going in this summer.
Grow it by the bay
Six metre bays make length the easy thing to add later, as long as the tank, the apron and the drains are not built hard against the gable you would extend from.
Height keeps doors open
A little more steel and sheeting at the eaves keeps tipping, stacking, lifting and housing stock all possible. Of all the options on the quote, it is the best value.
What you get asked to decide
- A door in each gable, so a trailer can pull through instead of backing out
- Fully sheeted, part-clad or open-fronted, depending on what spends the winter in it
- A panel wall part-way along, so one end can be kept clean and the other dirty
- A lean-to now, or a clear side left free for one later
- Supplied for your own people to put up, or supplied and erected
There is one more choice underneath all of those: whether the frame is cold rolled or hot rolled. It changes the price, the lead time, whether you can put it up yourself, and what goes in the ground.
How it goes from here
Five steps, in this order. The fourth is the one nobody prices for you up front, which is why there is a calculator further down this page.
Step 1
Tell us roughly what you need
Span, length and what it is for. Approximate is fine — nobody expects you to have decided, and it means the first reply can be useful rather than a list of questions.
Step 2
Drawings and a price for the frame
The manufacturer prepares engineered drawings and quotes the building. That includes the pad foundation sizes, which no calculator can work out for you.
Step 3
Settle the planning position
Prior approval on a qualifying agricultural holding, or a full application. Worth establishing before steel is ordered rather than after.
Step 4
Get the base in
Site strip, level, stone and slab, ready and cured before the erectors arrive. This is the part you can price on this page today.
Step 5
Delivery and erection
Delivered for your own team to put up, or supplied and erected. Both are normal; the difference is worth asking about at quote stage, not later.
Rough dimensions are enough to start. You get a reply the same day.
The use changes. The floor does not.
Cladding can be swapped, doors added, a partition put in or taken out, a lean-to hung off the side. The slab stays exactly as it was poured for as long as the shed stands. So the floor is the one decision to make against the hardest job the building might do, not the job it is going up for.
6.5 m³
The extra concrete to take a 12 × 20 m shed from 175 mm to 200 mm. That is the whole price of not having to guess the future correctly.
Put the same thought into falls. A floor that runs gently to the door costs nothing extra at the pour and means the shed can be washed out, bedded down or used for stock later. Cutting channels into a finished slab under a building is a different kind of job.
In Wales the rules follow the use
As a farm shed. On a holding of 5 hectares or more, a building of up to 465 m² that the farm reasonably needs goes in as a prior notification at £223, and the council has 28 days to ask to approve the siting and design. Under 5 hectares, no new building has that right.
With stock in it. The day it houses livestock, the 400 metre rule applies: within that distance of a dwelling off your unit, permitted development is gone. And housed stock that make slurry bring the Welsh requirement for 5 months of storage with them. The livestock buildings page covers both.
For anyone else. Storage for a contractor, a let to a neighbour's business, anything not for farming the holding: that is a change of use and a full planning application, however agricultural the shed looks.
And always the drainage. Any construction of 100 m² or more needs the council's SuDS Approval Body to approve where the roof water goes before work starts. It has 7 weeks and silence counts as a refusal, so send it with the prior notification.
In Wales, farm buildings get their permitted development rights from Part 6 of the 1995 General Permitted Development Order, which splits at 5 hectares — and the two halves are not the same right with different numbers on them.
On a unit of 5 hectares or more, Class A permits a new building, or the extension or alteration of one, if it is reasonably necessary for agriculture on that unit. Its ground area cannot exceed 465 square metres — counted together with anything else put up on the unit within 90 metres in the previous 2 years. It must be no more than 12 metres high and at least 25 metres from a trunk or classified road. England's limits are far larger; they do not apply here.
On a unit of 0.4 to under 5 hectares, Class B does not let you put up a new building at all. It permits a limited extension or alteration of a farm building you already have — no taller, no more than 10 per cent more volume, and no more than 465 square metres in all. With four hectares and nothing to extend, a new shed is a full planning application.
Where Class A applies, you are not applying for planning permission. You notify the council, which has 28 days to decide whether it wants to approve the siting, design and external appearance. You can start when it says it does not, when it approves them, or when 28 days pass without a reply — provided the building genuinely is permitted development in the first place.
One exclusion catches people: no building for livestock, and no slurry or sewage sludge store, within 400 metres of the curtilage of a protected building — broadly, a house that is not part of your own farm.
Two more things are Welsh. Construction of 100 square metres or more needs its drainage approved by the SuDS Approval Body even when it is permitted development. And in a National Park the park authority is the planning authority — here, the Bannau Brycheiniog National Park Authority or the Pembrokeshire Coast National Park Authority.
A summary, not planning advice. The legislation is SI 1995/418, Schedule 2, Part 6 as in force in Wales, checked against legislation.gov.uk on 23 September 2026. The full rules are on our planning guide for farm buildings in Wales. Confirm your own position with the authority that covers your site.
Leave room to grow
A lean-to down one side is usually the cheapest square metre you will buy, and another bay on the end the least disruptive way to get more shed. Both depend on what you build next to it now. Keep one side clear of the tank, the apron and the drainage run, keep one gable free to extend from, and tell the designer a lean-to may follow, because it changes how that side of the frame is detailed.
The pads come with the drawings
The concrete bases under each stanchion are designed by a structural engineer for your span, eaves, the wind on your site and your ground. They are not something a calculator can give you honestly, and they arrive with the drawings when you ask for a price. The calculator below does the rest: slab, stone and earthworks.
Work out the base for your building
Preset to 175 mm over 150 mm of stone. A 12 by 20 on level ground is about 45.5 m³ of concrete to order; switch the slab to 200 mm to see the heavier floor.
What this does not work out: the pad foundations
The concrete pads the stanchions sit on are sized by a structural engineer, not by a formula. They change with the span, the eaves height, the wind loading on your particular site and what the ground will bear. Anyone quoting you a pad size without a design has guessed it.
Want this priced properly?
Send us the job and we'll get you engineered drawings and a quote for the frame — with the pad sizes this tool can't work out. The figures above go with your enquiry, so you don't have to type them again.
Every enquiry gets a reply the same day, and your figures go with it. The building itself is designed and priced by South West Steel Buildings, our building partner, so your details go to them too, and they will be in touch. How we handle your details.
Common questions
- What does a general purpose shed end up doing on a Welsh farm?
- Whatever there is no other roof for. Big bales after a good summer, the ewes at lambing, the tractor and the quad through the winter, a load of fertiliser in spring, the shearing trailer in June. That is the point of it, and it is also why it tends to be the building worked hardest on the yard: every job lands in it at some point, so every decision about it should be made for the hardest of those jobs.
- How wide and how tall should it be?
- Set both for the most demanding use you can foresee. A steel frame cannot be made wider without taking a side off, and the eaves cannot be raised at all, while more length comes easily in 6 metre bays as long as nothing permanent has been built against the gable you would extend from. Extra eaves height is the cheapest insurance on the quote: a little more steel and sheeting keeps tipping, stacking bales, lifting with the telehandler and housing stock all possible.
- What slab should a mixed-use shed have?
- 175 mm with mesh is a sensible middle. If loaded trailers or a telehandler with a full bucket are likely to turn inside, go to 200 mm and treat it as a machinery floor. On a 12 by 20 metre shed the difference is about 6.5 cubic metres of concrete, worked from the same engine as the calculator. Breaking out and relaying a floor with a building standing over it costs many times that.
- What changes if I house sheep or cattle in it?
- Two things, both from the use, not the steel. Planning: permitted development is withdrawn for livestock housing within 400 metres of a dwelling that is not on your unit, so a shed that was fine for bales can need a full application to hold stock. And slurry: if housed stock produce slurry, the Welsh regulations require 5 months of storage for it. If stock are ever likely, say so at the design stage, form falls in the floor, and check the distance before it matters.
- Can I rent the shed out, or use it for another business?
- Not under agricultural permitted development. The right covers a building reasonably necessary for farming that holding, and the test attaches to what the shed is used for. Storage for a contractor, a haulier or anything else off the holding is a change of use and needs a full planning application, whatever the building looked like when it went up. Be straight about the intended use at the prior notification stage; a council that approves a farm shed can take a dim view of finding it let.
- Is there a grant for a general purpose building?
- Not for the building itself. The open scheme, SFS Optional: Small Infrastructure, pays towards a new roof over an existing livestock feeding area, gathering area or manure store, and a general purpose shed is none of those. The farm grants guide on this site tracks the other schemes as they open.
- What do the prior notification and SAB application cost in Wales?
- The prior notification for an agricultural building is £223 from 1 December 2025. It is on the Welsh Government's full cost recovery pathway, so it stays at £223 through 2026 and rises from 1 April 2027: the published policy allows up to 10% or £100 a year, whichever is greater, plus inflation, until the fee covers the council's cost. The SAB application is £350 plus a charge on the construction area shown on your site plan: £70 for every 0.1 hectare or part of one up to half a hectare, less per tenth beyond that, capped at £7,500. A shed on a plan of under 0.1 hectare is £420. If approval is conditional on inspections, each one is £168. The SAB has 7 weeks to decide, 12 with an Environmental Impact Assessment, and an application not decided in time counts as refused.
- Do I need planning permission for a farm building in Wales?
- It depends first on the size of the holding. On an agricultural unit of 5 hectares or more, Class A of Part 6 of the Town and Country Planning (General Permitted Development) Order 1995 permits a building reasonably necessary for agriculture on that unit, up to 465 square metres — counted together with anything else put up on the unit within 90 metres in the previous 2 years. It must be no more than 12 metres high (3 metres within 3 km of an aerodrome), at least 25 metres from a trunk or classified road, and a livestock building or slurry store must be at least 400 metres from a protected building. Before building you notify the council, which has 28 days to say whether it wants to approve the siting and design. On a unit of 0.4 to under 5 hectares Class B allows only a limited extension or alteration of an existing building, and a new building needs full planning permission; under 0.4 hectares there are no agricultural permitted development rights at all. England's larger limits do not apply in Wales.
- Does a farm building in Wales need SAB approval?
- If it covers 100 square metres or more and affects how rain soaks into the ground, yes — even when it is permitted development and needs no planning application. Since January 2019 construction of that size in Wales needs approval of its surface water drainage from the SuDS Approval Body, which is run by your local council, before work starts. Farm roofs and clean yards are included, and the rainwater off a new roof is usually the whole question.
- Can I convert a farm building to a house in Wales without planning permission?
- No. England has a permitted development right, Class Q, that lets some agricultural buildings become homes through a prior approval application. Wales has no equivalent: a barn conversion in Wales needs full planning permission from the local planning authority. Much of what is written about barn conversions online is about England, so check which country it was written for before relying on it.
Other buildings we cover
Same approach on each: what the building is, how it gets sized, where you stand on planning, and what the base underneath it comes to.
Machinery stores
A dry, clear-span shed for the tractor, the quad, the feed and the fertiliser, on a floor that takes a turning trailer. Priced above the ground and below it.
Grain stores
Retaining walls designed for the depth of grain, a slab for the loader, and a roof that does not drip on the heap.
Livestock buildings
Cattle and sheep housing for a Welsh winter: air in, muck out, water kept apart. With the slurry rules, the grants that do and do not apply, and the 400 metre trap.
Farm workshops
Space to mend a machine with room all round it, height for a hoist, and a floor built for axle stands. Plus the planning line between your kit and a repair business.
Hay barns
Bale storage for a wet summer: where to site it, what the fire services say about stacking, and the planning condition that follows a store near a house.
Stables and arenas
Stable blocks and arena buildings in Wales: a full planning application, a welfare code that sets the doors and headroom, and no farm grant.
Garages and workshops
Steel garages and workshops at the house or for a trade. The Welsh garden rules a steel frame meets first, and what an application costs when it misses one.
Industrial units
Warehouses, trade units and workshops in Wales: the use classes Wales kept, the fees and drainage approval, the rates bill and the finance.
Get a price for a shed that can change jobs
A rough size and the uses you can see coming is enough. South West Steel Buildings designs and prices the building with the pad sizes, and you already have the base costed.